Slip prevention

Slip prevention

Pencil and paperOnline interactive
Overview
Using this Resource
Connecting to the Curriculum
Marking Student Responses
Working with Students
Further Resources
This task is about erosion.

Question 1Change answer

A new road has been made which has a steep bank on the side.
 
What are two different methods that could be used to prevent slips on the steep bank?
1.
2.
 
Task administration: 
This task can be completed with pencil and paper.
Level:
4
Curriculum info: 
Description of task: 
Students suggest ways to prevent a steep bank slipping. The assessment focus is application of their knowledge about erosion.
Answers/responses: 
 

Y8 (12/1997)

Any 2 of: 
  • cut terraces in the slope
  • sow grass seed 
  • cover with wire mesh 
  • build a retaining wall 
  • plant shrubs 
  • take more earth off the top of the bank so that it slopes more drainage in bank 
  • any other acceptable answer
2 correct – difficult

1 correct – easy

Diagnostic and formative information: 

Analysis of correct responses

The two most common correct answers given were:

•   cover with wire mesh or similar
•   build a retaining wall